CIVIC

BSFD Station No. 3

Date:               December 2023 - January 2024

Location:        Yellowstone, Wyoming

Description:  11,300 gross SF fire station including site improvements. The building is designed as a 50-75 year essential services building.

Role:              Produced concept designs, 3D massing, preliminary site design, and schematic floor plans.

MVFR Station No. 14

Date:               December 2023 - present

Location:        West Mead, Colorado

Description:  16,625 gross SF fire station, which includes living quarters, common area, and apparatus bay. The building is designed as a 50-75 year essential services building.

Role:              Produced concept designs, renderings, preliminary site design. Involved with early concept designs and site selection. Project is currently in the Schematic Design phase.

MVFR Station No. 15

Date:               January 2024 - present

Location:        Erie, Colorado

Description:  12,710 gross SF fire station, which includes living quarters, common area, and apparatus bay. The building is designed as a 50-75 year essential services building.

Role:              Produced concept designs, renderings, preliminary site design. Involved with early concept designs and site selection. Responsible for consultant coordination and design documentation from concept design through construction documents. Assisted in permitting process.

WMFR Reserve Facility

Date:               February 2024 - present

Location:        Lakewood, Colorado

Description:  7,700 gross SF fire department facilities building designed to house emergency service vehicles. The building shares a site with an existing firestation and considerations were given to the complement the design of the existing architecture.

Role:              Produced renderings and 3D visualization. Responsible for consultant coordination and design documentation from schematic design through construction documents. Assisted in permitting process.

COMMERCIAL

Urban Office Building - CC Concept Design

Date:               April 2023

Location:        Denver, Colorado

Description:  55,300 gross SF mixed use office building with 2 below grade parking level (98 stalls), street level retail space (12,345 GSF), & 3 levels of office space.

Role:              Produced concept designs, renderings, parking layouts, & yield studies. Created a design package for client to use to engage investors & potential anchor tenants.

Tennant Interiors - M

Date:               February 2023

Location:        Denver, Colorado

Description:  The project is a first-generation, 33,245 SF, tenant improvement of an office space. The project spans over 2 levels; scope includes an internal stair connection 2 floors, reception, private offices, conference rooms, break area, golf simulator, bike storage, & custom millwork feature walls & ceilings.

Role:              Assisted in the production of Design Development documentation, coordination, & millwork details.

Tennant Interiors - P

Date:               March 2023

Location:        Denver, Colorado

Description:  The project is a first-generation, 14,600 SF, tenant improvement of an office space. The scope includes reception, private offices, conference rooms, break area & extensive millwork.

Role:              Assisted in the production of Design Development documentation & millwork details.

Urban Office Building - HP

Date:               November - December 2022

Location:       Greenwood Village, Colorado

Description:  134,000 SF,12-story office tower

Role:             Assisted in Design Development documentation including curtainwall & stair detailing.

education k-12

Three Creeks K-8 School - Classroom Wing Addition

Date:              January 2019 - July 2020

Location:       Arvada, Colorado

Description: 30,000 SF addition to existing K-8 school. New addition includes 8 classrooms, a Counseling Suite, & Special Education Suite.

Role:              Project Architect | Design coordination & documentation.


Cherry Creek School District - Innovation Spaces Bond 

Belleview Elementary

Campus Middle School

Cherry Hills Village Elementary

Cottonwood Creek Elementary

Dry Creek Elementary

Greenwood Elementary

Heritage Elementary

Homestead Elementary

Holly Hills Elementary

Holly Ridge Elementary

Walnut Hills Elementary

West Middle School

Willow Creek Elementary

Date:             December 2017 - September 2019

Location:      Greenwood Village & Centennial, Colorado

Description: Schools are given the opportunity to apply bond funds to renovations in their facilities that support innovative learning. For most of these schools this translates to a renovation of existing libraries, the creation of Maker Spaces, and updating classrooms to support STEM & STEAM programs. There are a total of 13 schools, designed in 3 different packages. Schools listed above reflect projects in design or construction phases.

Role:              Project Architect | Project Manager | Design Architect | Interior Designer

 

Jefferson Academy - Secondary School Arts & Athletic Addition

Date:              October 2017 - June 2018

Location:       Broomfield, Colorado

Description:  Addition to the existing Secondary Academy school. The addition includes a gym expansion, new performing arts center & associated program, and 6 classroom addition. Because the budget for this project is uncertain, we were asked to design 6 options showing a variety of scope, & allowing our client to get pricing for each option. 

Role:               Project Architect during Master Planning and Schematic Design

 

Weld-8 Early Childhood Education Center & Administration Building

Date:               January 2016 - August 2018

Location:       Fort Lupton, Colorado

Description:  20,000 SF building containing an early childhood education center on the first floor & the Weld-8 School District administrative offices on the second floor. The new building site sits on the edge of the Fort Lupton academic campus also containing Fort Lupton H.S., Butler Elementary, & the historic Fort Lupton Middle School. Some of the goals of this design: security separation between the pre-school & administrative programs & creating an exterior that responds to the design fabric of the surrounding existing schools

Role:              Project Architect | Produced design & documentation for Schematic Design, Design Development, Construction Documents, & served as the primary contact during Construction Administration.



Kenneth Homyak Pk-8 School

Date:               January 2016 - May 2018

Location:       Fort Lupton, Colorado

Role:              Aided Project Architect & Project Manager with documentation Design Development & Construction Documents. Active member in design charrettes & concept development to guide team design direction.

 

Three Creeks K-8School

Date:              September 2015 - October 2017

Location:       Arvada, Colorado

Role:              Project Architect | Pre-interview, creating site plan, diagrams, & graphics. Worked directly with project designer during programming phase to construction documents. Assisted interior design team throughout building & championed interior design of the Learning Commons & ceiling design.

 

Denver Christian K-12 School

Date:               January - April 2014

Location:        Lakewood, Colorado

Description:  Conversion of a telecom training facility into a K-12 school, gym addition. New school contains an Elementary library and Middle School library

Role:               Drawing production design development through construction documents. Emphasis on assisting with interior design & designing library.

 

Valor Christian Academy Center for Performing Arts

Date:              October 2013 - January 2014

Location:       Highlands Ranch, Colorado

Description:  New 82,579 sf performing arts center, 700 seat auditorium, professional level audio & video recording studios - Pursuing LEED Silver

Role:              Drawing production design development through construction documents. Emphasis on assisting with interior design.

 

 

HIGHER EDUCATION

University of Colorado - Norlin Library Entry Renovation

Date:               November 2020 - December 2021

Location:        Boulder, Colorado

Description:  The goal of this renovation was to create a new entry experience at the West entry of the 1938 historic library at the University of Colorado. Design elements include a new vestibule that allows for great accessibility for users. Upon entry, users are greeted with a new lounge space & a variety of both independent & group study spaces. Our team was responsible for the redesign of this new study and lounge space including new finishes, lighting fixtures, ceilings, & furniture selection.

Role:           Project Architect/Project Manager

Colorado State University - Lory Student Center Phase III Renovation

Date:               August 2019 - April 2022

Location:        Fort Collins, Colorado

Description:  Mechanical/electrical/plumbing systems replacement

                         Renovation of school book store, Adult Veteran Learners facility, meeting spaces, & ballrooms.

                        Target of LEED Gold

Role:               Project Architect

University of Colorado, Ketchum Arts & Sciences 

Date:               April - December 2014

Location:        Boulder, Colorado

Description:  Mechanical/electrical/plumbing systems replacement

                         Renovation of classroom/office building

                         LEED Gold

Role:               Drawing production design development through construction documents. Assisted with consultant coordination & LEED documentation.

INSTITUTIONAL

Museum Plaza, Entry, & Theater Lobby Renovation

Date:               April 2023 - present

Location:        Denver, Colorado

Description:  This project includes 4 areas of focus: plaza, grand stair & elevator, lobby & lounge, & atrium ramps. The renovation of existing plaza, consists of mirroring sculptural feature walls with vegetated base, picnic areas, event space, & new ETFE plaza canopy. The entry sequence has been re-designed to bring the original 1938 monolithic stair, which was enclosed in a 1980’s renovation, back to former glory as an exterior gathering space for the community. The project includes upgrades such as an freight sized glass elevator cab & enclosure, new interior ramps & stairs, & new glass entry vestibules to meet current ADA & energy codes. Interior scope includes the re-imagination of the theater Lobby, ticketing booth, night lounge, restrooms, & the addition of a bar.

Role:               Project Architect

Co-lead & planned weekly client design meetings, primary point of contact with client & consultants, managed the design team during Schematic Design, responsible for weekly coordination meetings with design consultants & engineers.

Colorado State University - Hydro Center

Date:               February 2020 - present

Location:        Denver, Colorado

Description:  Project focused around Water in the West and everything water in Colorado. This facility house a variety of program including a Visitors Center, Event Space, Café, Water Testing Labs, Headquarters for Denver Water, a work share space, educational exhibits & more. In addition to the construction of the main Hydro Center, our team was tasked with rehabilitating &connecting an existing historic structure & converting it to leasable workshare spaces & artist studios.

                        Target of LEED Gold

Role:               Project Architect

During conceptual design through Design Development, I was involved with developing the massing, scrim exo-skeleton & interior architecture. As the project moved from Design Development, I focused on the interior architecture.

MASTER PLANNING

Village East Elementary School

Date:              September 2018 - present

Location:       Aurora, Colorado

Jefferson Academy - Secondary School

Date:              October - December 2017

Location:       Broomfield, Colorado

 

Flatirons Academy

Date:              May - July 2017

Location:       Colorado

 

Boulder Valley Special Needs Campus

Date:               2017

Location:        Boulder, Colorado

 

MULTI-FAMILY 

Mixed-use Micro Housing

Date:              May - December 2022

Location:       Denver, Colorado

Role:               Project Architect & Designer concept through design development. 49,000 gross square feet, 72 residential units.

The Haven at National Harbor

Date:              May - July 2016

Location:       Baltimore, Maryland

Role:               Drawing production design development through construction documents

 

single family residential

Highlands Addition & Renovation

Date:             Summer 2013

Location:      Denver, Colorado

Role:              Schematic design, 3D digital model creation, permit drawing production.

 

interview preparation & Proposals:

2021

- Arapahoe Community College

2021

- Colorado Mountain College Student Housing

- Colorado State University As Needed Contract

- Community College of Aurora - Center for Applied Engineering

- Colorado State University Housing As Needed Contract

2020

- Colorado Mountain College Nursing Simulation Labs & Health Sciences

-University of Colorado Library Entry Renovation

- University of New Mexico College of Nursing

- Western Wyoming State Health Sciences

2017

- Cherrelyn Elementary

- Arapahoe Community College Collaborative Campus

2016

- 9+CO Residential Tower

- Monument Creek Apartment Complex

- CSU Natural Resources Building Addition, Colorado State University

2015

- Candelas K-8 School, Jefferson County Schools

- CSU Biology Building, Colorado State University 

- Frasier Meadows Retirement Community Addition and Renovation