CIVIC
BSFD Station No. 3
Date: December 2023 - January 2024
Location: Yellowstone, Wyoming
Description: 11,300 gross SF fire station including site improvements. The building is designed as a 50-75 year essential services building.
Role: Produced concept designs, 3D massing, preliminary site design, and schematic floor plans.
MVFR Station No. 14
Date: December 2023 - present
Location: West Mead, Colorado
Description: 16,625 gross SF fire station, which includes living quarters, common area, and apparatus bay. The building is designed as a 50-75 year essential services building.
Role: Produced concept designs, renderings, preliminary site design. Involved with early concept designs and site selection. Project is currently in the Schematic Design phase.
MVFR Station No. 15
Date: January 2024 - present
Location: Erie, Colorado
Description: 12,710 gross SF fire station, which includes living quarters, common area, and apparatus bay. The building is designed as a 50-75 year essential services building.
Role: Produced concept designs, renderings, preliminary site design. Involved with early concept designs and site selection. Responsible for consultant coordination and design documentation from concept design through construction documents. Assisted in permitting process.
WMFR Reserve Facility
Date: February 2024 - present
Location: Lakewood, Colorado
Description: 7,700 gross SF fire department facilities building designed to house emergency service vehicles. The building shares a site with an existing firestation and considerations were given to the complement the design of the existing architecture.
Role: Produced renderings and 3D visualization. Responsible for consultant coordination and design documentation from schematic design through construction documents. Assisted in permitting process.
COMMERCIAL
Urban Office Building - CC Concept Design
Date: April 2023
Location: Denver, Colorado
Description: 55,300 gross SF mixed use office building with 2 below grade parking level (98 stalls), street level retail space (12,345 GSF), & 3 levels of office space.
Role: Produced concept designs, renderings, parking layouts, & yield studies. Created a design package for client to use to engage investors & potential anchor tenants.
Tennant Interiors - M
Date: February 2023
Location: Denver, Colorado
Description: The project is a first-generation, 33,245 SF, tenant improvement of an office space. The project spans over 2 levels; scope includes an internal stair connection 2 floors, reception, private offices, conference rooms, break area, golf simulator, bike storage, & custom millwork feature walls & ceilings.
Role: Assisted in the production of Design Development documentation, coordination, & millwork details.
Tennant Interiors - P
Date: March 2023
Location: Denver, Colorado
Description: The project is a first-generation, 14,600 SF, tenant improvement of an office space. The scope includes reception, private offices, conference rooms, break area & extensive millwork.
Role: Assisted in the production of Design Development documentation & millwork details.
Urban Office Building - HP
Date: November - December 2022
Location: Greenwood Village, Colorado
Description: 134,000 SF,12-story office tower
Role: Assisted in Design Development documentation including curtainwall & stair detailing.
education k-12
Three Creeks K-8 School - Classroom Wing Addition
Date: January 2019 - July 2020
Location: Arvada, Colorado
Description: 30,000 SF addition to existing K-8 school. New addition includes 8 classrooms, a Counseling Suite, & Special Education Suite.
Role: Project Architect | Design coordination & documentation.
Cherry Creek School District - Innovation Spaces Bond
Belleview Elementary
Campus Middle School
Cherry Hills Village Elementary
Cottonwood Creek Elementary
Dry Creek Elementary
Greenwood Elementary
Heritage Elementary
Homestead Elementary
Holly Hills Elementary
Holly Ridge Elementary
Walnut Hills Elementary
West Middle School
Willow Creek Elementary
Date: December 2017 - September 2019
Location: Greenwood Village & Centennial, Colorado
Description: Schools are given the opportunity to apply bond funds to renovations in their facilities that support innovative learning. For most of these schools this translates to a renovation of existing libraries, the creation of Maker Spaces, and updating classrooms to support STEM & STEAM programs. There are a total of 13 schools, designed in 3 different packages. Schools listed above reflect projects in design or construction phases.
Role: Project Architect | Project Manager | Design Architect | Interior Designer
Jefferson Academy - Secondary School Arts & Athletic Addition
Date: October 2017 - June 2018
Location: Broomfield, Colorado
Description: Addition to the existing Secondary Academy school. The addition includes a gym expansion, new performing arts center & associated program, and 6 classroom addition. Because the budget for this project is uncertain, we were asked to design 6 options showing a variety of scope, & allowing our client to get pricing for each option.
Role: Project Architect during Master Planning and Schematic Design
Weld-8 Early Childhood Education Center & Administration Building
Date: January 2016 - August 2018
Location: Fort Lupton, Colorado
Description: 20,000 SF building containing an early childhood education center on the first floor & the Weld-8 School District administrative offices on the second floor. The new building site sits on the edge of the Fort Lupton academic campus also containing Fort Lupton H.S., Butler Elementary, & the historic Fort Lupton Middle School. Some of the goals of this design: security separation between the pre-school & administrative programs & creating an exterior that responds to the design fabric of the surrounding existing schools
Role: Project Architect | Produced design & documentation for Schematic Design, Design Development, Construction Documents, & served as the primary contact during Construction Administration.
Kenneth Homyak Pk-8 School
Date: January 2016 - May 2018
Location: Fort Lupton, Colorado
Role: Aided Project Architect & Project Manager with documentation Design Development & Construction Documents. Active member in design charrettes & concept development to guide team design direction.
Three Creeks K-8School
Date: September 2015 - October 2017
Location: Arvada, Colorado
Role: Project Architect | Pre-interview, creating site plan, diagrams, & graphics. Worked directly with project designer during programming phase to construction documents. Assisted interior design team throughout building & championed interior design of the Learning Commons & ceiling design.
Denver Christian K-12 School
Date: January - April 2014
Location: Lakewood, Colorado
Description: Conversion of a telecom training facility into a K-12 school, gym addition. New school contains an Elementary library and Middle School library
Role: Drawing production design development through construction documents. Emphasis on assisting with interior design & designing library.
Valor Christian Academy Center for Performing Arts
Date: October 2013 - January 2014
Location: Highlands Ranch, Colorado
Description: New 82,579 sf performing arts center, 700 seat auditorium, professional level audio & video recording studios - Pursuing LEED Silver
Role: Drawing production design development through construction documents. Emphasis on assisting with interior design.
HIGHER EDUCATION
University of Colorado - Norlin Library Entry Renovation
Date: November 2020 - December 2021
Location: Boulder, Colorado
Description: The goal of this renovation was to create a new entry experience at the West entry of the 1938 historic library at the University of Colorado. Design elements include a new vestibule that allows for great accessibility for users. Upon entry, users are greeted with a new lounge space & a variety of both independent & group study spaces. Our team was responsible for the redesign of this new study and lounge space including new finishes, lighting fixtures, ceilings, & furniture selection.
Role: Project Architect/Project Manager
Colorado State University - Lory Student Center Phase III Renovation
Date: August 2019 - April 2022
Location: Fort Collins, Colorado
Description: Mechanical/electrical/plumbing systems replacement
Renovation of school book store, Adult Veteran Learners facility, meeting spaces, & ballrooms.
Target of LEED Gold
Role: Project Architect
University of Colorado, Ketchum Arts & Sciences
Date: April - December 2014
Location: Boulder, Colorado
Description: Mechanical/electrical/plumbing systems replacement
Renovation of classroom/office building
LEED Gold
Role: Drawing production design development through construction documents. Assisted with consultant coordination & LEED documentation.
INSTITUTIONAL
Museum Plaza, Entry, & Theater Lobby Renovation
Date: April 2023 - present
Location: Denver, Colorado
Description: This project includes 4 areas of focus: plaza, grand stair & elevator, lobby & lounge, & atrium ramps. The renovation of existing plaza, consists of mirroring sculptural feature walls with vegetated base, picnic areas, event space, & new ETFE plaza canopy. The entry sequence has been re-designed to bring the original 1938 monolithic stair, which was enclosed in a 1980’s renovation, back to former glory as an exterior gathering space for the community. The project includes upgrades such as an freight sized glass elevator cab & enclosure, new interior ramps & stairs, & new glass entry vestibules to meet current ADA & energy codes. Interior scope includes the re-imagination of the theater Lobby, ticketing booth, night lounge, restrooms, & the addition of a bar.
Role: Project Architect
Co-lead & planned weekly client design meetings, primary point of contact with client & consultants, managed the design team during Schematic Design, responsible for weekly coordination meetings with design consultants & engineers.
Colorado State University - Hydro Center
Date: February 2020 - present
Location: Denver, Colorado
Description: Project focused around Water in the West and everything water in Colorado. This facility house a variety of program including a Visitors Center, Event Space, Café, Water Testing Labs, Headquarters for Denver Water, a work share space, educational exhibits & more. In addition to the construction of the main Hydro Center, our team was tasked with rehabilitating &connecting an existing historic structure & converting it to leasable workshare spaces & artist studios.
Target of LEED Gold
Role: Project Architect
During conceptual design through Design Development, I was involved with developing the massing, scrim exo-skeleton & interior architecture. As the project moved from Design Development, I focused on the interior architecture.
MASTER PLANNING
Village East Elementary School
Date: September 2018 - present
Location: Aurora, Colorado
Jefferson Academy - Secondary School
Date: October - December 2017
Location: Broomfield, Colorado
Flatirons Academy
Date: May - July 2017
Location: Colorado
Boulder Valley Special Needs Campus
Date: 2017
Location: Boulder, Colorado
MULTI-FAMILY
Mixed-use Micro Housing
Date: May - December 2022
Location: Denver, Colorado
Role: Project Architect & Designer concept through design development. 49,000 gross square feet, 72 residential units.
The Haven at National Harbor
Date: May - July 2016
Location: Baltimore, Maryland
Role: Drawing production design development through construction documents
single family residential
Highlands Addition & Renovation
Date: Summer 2013
Location: Denver, Colorado
Role: Schematic design, 3D digital model creation, permit drawing production.
interview preparation & Proposals:
2021
- Arapahoe Community College
2021
- Colorado Mountain College Student Housing
- Colorado State University As Needed Contract
- Community College of Aurora - Center for Applied Engineering
- Colorado State University Housing As Needed Contract
2020
- Colorado Mountain College Nursing Simulation Labs & Health Sciences
-University of Colorado Library Entry Renovation
- University of New Mexico College of Nursing
- Western Wyoming State Health Sciences
2017
- Cherrelyn Elementary
- Arapahoe Community College Collaborative Campus
2016
- 9+CO Residential Tower
- Monument Creek Apartment Complex
- CSU Natural Resources Building Addition, Colorado State University
2015
- Candelas K-8 School, Jefferson County Schools
- CSU Biology Building, Colorado State University
- Frasier Meadows Retirement Community Addition and Renovation